The Crack Seal will be done throughout Baker from Sept. 2nd through Sept. 9th
The Chip Seal will be done in specified areas from Sept 11th through Sept 13th. These are areas that have new asphalt.
Please note that the schedule will be dependent upon weather conditions.
Harddrives Construction is the contractor, the same as the 2023 Street Improvement Project. They will cover traffic control and notifications to residents as the work progresses. They will notify residents where areas are be cleared for the crack sealing schedule.
All vehicles, trailers, boats and campers, etc. must be removed from the indicated Chip Seal Project areas in the chart below from Sept. 10 to Sept. 14th or until work is completed.
Please be aware of the work crews and respect the timelines they give before travelling areas being worked on. They are using fast setting materials but they still need an hour or so curing time dependent upon humidity and temperature.
The public’s cooperation is greatly appreciated!
Please refer to the chart below for areas being worked.
Crack Seal Project – Scheduled for Sept 2 through Sep 9, 2025
|
||
Throughout the City of Baker, all streets and avenues
|
||
Chip Seal Project – Scheduled for Sept 11 through Sept 13, 2025
|
||
Street Name
|
Start Location
|
End Location
|
S 6TH ST W
|
SEWALL AVE
|
HIGHWAY12
|
S 5TH ST W
|
HIGHWAY 12
|
RAILROAD AVE
|
S 4TH ST W
|
HIGHWAY12
|
1/2 BLOCK SOUTH
|
S 3RD ST W
|
HIGHWAY 12
|
1/2 BLOCK SOUTH
|
S 3RD ST W
|
RAILROAD AVE
|
1/2 BLOCK SOUTH
|
S 2ND ST W
|
GREGORY AVE
|
MARTIN AVE
|
S 2ND STW
|
HIGHWAY 12
|
1/2 BLOCK SOUTH
|
S 2NDSTW
|
HIGHWAY 12
|
RAILROAD AVE
|
S1ST ST W
|
HIGHWAY 12
|
RAILROAD AVE
|
S 1ST ST W
|
HIGHWAY 12
|
1 BLOCK SOUTH
|
S 1ST STE
|
HIGHWAY 12
|
RAILROAD AVE
|
S 2NDSTE
|
E CENTER AVE
|
E FALLON AVE
|
S 3RD ST E
|
HIGHWAY 12
|
RAILROAD AVE
|
S 7TH ST E
|
TEXAS AVE
|
1 BLOCK SOUTH
|
EVERETT AVE
|
S 5TH ST W
|
S 4TH STREET W
|
E FALLON AVE
|
HIGHWAY7
|
S 3RD ST E
|
E LINCOLN AVE
|
HIGHWAY 7
|
S 3RD ST E
|
E PLEASANT AVE
|
HIGHWAY 7
|
S 3RD STE
|
TEXAS AVE
|
S 6TH STE
|
S 7TH ST E
|
Steve Zachmann, Mayor